تعداد نشریات | 418 |
تعداد شمارهها | 9,997 |
تعداد مقالات | 83,560 |
تعداد مشاهده مقاله | 77,801,329 |
تعداد دریافت فایل اصل مقاله | 54,843,942 |
Time Prediction Using a Neuro-Fuzzy Model for Projects in the Construction Industry | ||
Journal of Optimization in Industrial Engineering | ||
مقاله 9، دوره 9، شماره 19، خرداد 2016، صفحه 97-103 اصل مقاله (2.63 M) | ||
شناسه دیجیتال (DOI): 10.22094/joie.2016.231 | ||
نویسندگان | ||
Behnam Vahdani* 1؛ Seyed Meysam Mousavi2؛ Morteza Mousakhani3؛ Hassan Hashemi4 | ||
1Assistant Professor, Industrial Engineering Research Center, Islamic Azad University, Qazvin Branch, Qazvin, Iran | ||
2PhD Student, Young Researches Club, South Tehran Branch, Islamic Azad University, Tehran, Iran | ||
3Associate Professor, Department of Business Management, Faculty of Management and Economics, Science and Research Branch, Islamic Azad University, Tehran, Iran | ||
4MSc, Young Researches Club, South Tehran Branch, Islamic Azad University, Tehran, Iran | ||
چکیده | ||
This paper presents a prediction model based on a new neuro-fuzzy algorithm for estimating time in construction projects. The output of the proposed prediction model, which is employed based on a locally linear neuro-fuzzy (LLNF) model, is useful for assessing a project status at different time horizons. Being trained by a locally linear model tree (LOLIMOT) learning algorithm, the model is intended for use by members of the project team in performing the time control of projects in the construction industry. The present paper addresses the effects of different factors on the project time and schedule by using both fuzzy sets theory (FST) and artificial neural networks (ANNs) in a construction project in Iran. The construction project is investigated to demonstrate the use and capabilities of the proposed model to see how it allows users and experts to actively interact and, consequently, make use of their own experience and knowledge in the estimation process. The proposed model is also compared to the well-known intelligent model (i.e., BPNN) to illustrate its performance in the construction industry. | ||
کلیدواژهها | ||
Construction Projects؛ Time prediction؛ Artificial neural networks؛ locally linear neuro-fuzzy model | ||
آمار تعداد مشاهده مقاله: 3,668 تعداد دریافت فایل اصل مقاله: 2,829 |