Hasanpour, Javad, Ghodoosi, Mohammad, Hosseini, Zahra Sadat. (1395). Optimizing a bi-objective preemptive multi-mode resource constrained project scheduling problem: NSGA-II and MOICA algorithms. نشریه علمی پژوهشی دانشگاه آزاد اسلامی, 10(21), 79-92. doi: 10.22094/joie.2016.263
Javad Hasanpour; Mohammad Ghodoosi; Zahra Sadat Hosseini. "Optimizing a bi-objective preemptive multi-mode resource constrained project scheduling problem: NSGA-II and MOICA algorithms". نشریه علمی پژوهشی دانشگاه آزاد اسلامی, 10, 21, 1395, 79-92. doi: 10.22094/joie.2016.263
Hasanpour, Javad, Ghodoosi, Mohammad, Hosseini, Zahra Sadat. (1395). 'Optimizing a bi-objective preemptive multi-mode resource constrained project scheduling problem: NSGA-II and MOICA algorithms', نشریه علمی پژوهشی دانشگاه آزاد اسلامی, 10(21), pp. 79-92. doi: 10.22094/joie.2016.263
Hasanpour, Javad, Ghodoosi, Mohammad, Hosseini, Zahra Sadat. Optimizing a bi-objective preemptive multi-mode resource constrained project scheduling problem: NSGA-II and MOICA algorithms. نشریه علمی پژوهشی دانشگاه آزاد اسلامی, 1395; 10(21): 79-92. doi: 10.22094/joie.2016.263


سامانه مدیریت نشریات علمی. قدرت گرفته از سیناوب