تعداد نشریات | 418 |
تعداد شمارهها | 10,005 |
تعداد مقالات | 83,625 |
تعداد مشاهده مقاله | 78,449,622 |
تعداد دریافت فایل اصل مقاله | 55,466,309 |
Using Electromagnetism Algorithm for Determining the Number of kanbans in a Multi-stage Supply Chain System | ||
Journal of Optimization in Industrial Engineering | ||
مقاله 8، Volume 3، Issue 6، بهمن 2010، صفحه 63-72 اصل مقاله (677.22 K) | ||
نویسندگان | ||
Majid Khalili* 1؛ Mohammad Jafar Tarokh2؛ Bahman Naderi3 | ||
1Islamic Azad University, Karaj branch,, Department of Industrial Engineering, Alborz, Iran | ||
2Department of Industrial Engineering, K.N.Toosi University, Tehran, Iran | ||
3Department of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran | ||
چکیده | ||
This paper studies the multi-stage supply chain system (MSSCM) controlled by the kanban mechanism. In the kanban system, decision making is based on the number of kanbans as well as batch sizes. A kanban mechanism is employed to assist in linking different production processes in a supply chain system in order to implement the scope of just-in-time (JIT) philosophy. For a MSSCM, a mixed-integer nonlinear programming (MINLP) problem is formulated from the perspective of JIT delivery policy where a kanban may reflect to a transporter. Since the adopted model is of MINLP type and solving it by branch and bound (B&B) takes time, a metaheuristic is presented. This metaheuristic is an electromagnetic algorithm (EA). The EA is compared against an existing algorithm and also B&B results to evaluate the proposed metaheuristic. Extensive experiments and statistical analyses demonstrate that our proposed EM is more efficient than B&B with regard to the objective functions considered in this paper. | ||
کلیدواژهها | ||
Kanban؛ Multi-stage supply chain system (MSSCS)؛ Mixed integer non-linear programming (MINLP)؛ Electromagnetism algorithm (EA) | ||
آمار تعداد مشاهده مقاله: 4,119 تعداد دریافت فایل اصل مقاله: 3,356 |