- Demeulemeester W S., Herrolen W S.(2002). Project Scheduling. Kluwer Academic Publishers.
- Brucker P. Drexl A. Mohring R. Neumann K. Pesch E. (1999). Resource-constrained project scheduling: Notation, classification, models, and methods. European Journal of Operational Research, 112, 3–41.
- Sprecher A. (1997). Exact algorithm for RCPSP in multi-mode case. OR Spectrum, 19(3), 95-203.
- Buddhakulsomsiria J., Kim D.S. (2006). Properties of multi-mode resource constrained project scheduling problems with resource vacations and activity splitting, European Journal of Operational Research, 175, 279–295.
- Buddhakulsomsiria J. Kim D.S. (2007).Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting. European Journal of Operational Research, 178,374–390.
- Schultmann F. Rentz O. (2001). Environment-oriented project scheduling for the dismantling of buildings. OR Spectrum, 23(1), 51–78.
- Demeulemeester E.L. de Reyck B. Herroelen W.S.(2000). The discrete time/resource trade-off problem in project networks – A branch-and-bound approach. IIE Transactions, 32,1059–1069.
- Ranjbar M. Kianfar F. (2007). Solving the discrete time/resource trade-off problem in project scheduling with genetic algorithms. Applied Mathematics and Computation, 191, 451–456.
- Ranjbar M. de Reyck B. Kianfar F. (2009). A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling. European Journal of Operational Research, 193, 35–48.
- Akkan C., Drexl A., Kimms A., (2005). Network decomposition-based benchmark results for the discrete time-cost tradeoff problem, European Journal of Operational Research, 165, 339–358.
- Maniezzo V. Mingozzi A.(1999). The project scheduling problem with irregular starting time costs. Operations Research Letters, 25(4), 175–182.
- Mohring R.H. Schulz A.S. Stork F. Uetz M. (2001). On project scheduling with irregular starting time costs. Operations Research Letters, 28 (4): 149–154.
- Wang Qiusheng, Autom. Sci. & Electr. Eng., Beihang Univ., Beijing. (2013). China Browse Conference Publications .Instrumentation, Measurement. A Modified Shuffled Frog Leaping Algorithm with Convergence of Update Process in Local Search,IEEE,1016 - 1019
- Alghazi A.. Shokri Z. Selim. And Elazouni A. .(2012).Performance of Shuffled Frog-Leaping Algorithm in Finance-Based Scheduling, Journal of Computing in Civil Engineering, 396-408.
- Eusuffa M. Lanseyb K. And Pashab F. (2006).Shuffled frog-leaping algorithm: a mimetic meta-heuristic for discrete optimization. Engineering Optimization, 38(2), 129-154.
- Tavakolan M.(2011).Applying the Shuffled Frog-Leaping Algorithm to Improve Scheduling Of Construction Projects With Activity Spliting Allowed. Management and Innovation for a Sustainable Built Environment.
- Afshar A. Kasaeian Ziaraty A. Kaveh A. Sharifi F. Nondominated .(2009).Archiving Multicolony Ant Algorithm in Time-Cost Trade-Off Optimization. J. Constr. Eng. Mgmt., 135(7), 668-674.
- Duan Q. Sorooshian S. and Gupta V. (1992).Effective and Efficient Global Optimization for Conceptual Rainfall Runoff models. Journal of Water Resources Res, 28,1015-1031.
- Elbeltagi E. Hegazy T. and Grierson D. (2005).Comparison Among Five Evolutionary-based Optimization Algorithms, Adv. Eng. Inf., 19 (1), 43-53.
- Elbeltagi, E. (2016). A Modified Shuffled Frog Leaping Algorithm for Optimizing Bridge-Deck Repairs, Int. Conference on Bridge Mgmt. Systems. Egypt, Cairo, 1-10.
- Eusuff M. M., Lansey K.E. (2003). Optimizing of Water Distribution Network Design Using the Shuffled Frog Leaping Algorithm, J. Water Resource Plan Mgmt., 129(3), 210-225.
- Zamani, R. (2013). A competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem. European Journal of Operational Research, 229, 552-559.
- Sadeghi A. Kalanaki A. Noktehdan A, Safi Samghabadi A. Barzinpour F.(2011).Using Bees Algorithm to Solve the Resource Constrained Project Scheduling Problem in PSPLIB, Communications in Computer and Information Science, 164:486-494.
- Brucker P. Drexl A.Mohring R. Neumann K. Pesch E. (1999).Resource-constrained project scheduling: Notation, classication, models, and methods, European Journal of Operational Research: 3-41.
- Wang A. Wang Xu A. GeXian-long B. Lei D. (2014).Multi-objective optimization model for multi-project scheduling on critical chain. Advances in Engineering Software, 31-48.
- Afshar B., Nadjafi J., Rahimi A., Karimi H. (2013). A genetic algorithm for mode identity and the resource constrained project scheduling problem.
- Alcaraz J.Maroto C. Ruiz R.(2003).Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms. Journal of Operation Research Society, 54, 614-626.
- Elloumi S. Fortemps P.(2012).A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem. European Journal of Operational Research, 205: 31-41.
- Jarboui B. Damak N. Siarry P.Rebai A. (2012). A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems. Applied Mathematics and Computation, 195, 299-308.
- Jozefowska J., Mika M., Rozycki R., Waligora G. (2006). Simulated annealing for multi-mode resource-constrained project scheduling. Annals of Operations Research, 102, 137-155.
- Kolisch R. Drexl A. (2010).Local search for non-preemptive multi-mode resource-constrained project scheduling. IIE Transactions 29, 987-999.
- Kolisch R. Hartmann S. (1999). Heuristic algorithms for solving the resource-constrained project scheduling problem: classification. Computational, analysis. Project Scheduling: Recent Models, Algorithms and Applications. Kluwer Press, Berlin, 147-178.
- Kolisch R.(2002). Serial and parallel resource-constrained project scheduling methods revisited: theory and computation. European Journal of Operational Research, 90:320-333.
|