- Ansari, H., & Davari, K. (2009). Estimates of rainfall data with fuzzy technique. Iran Water Resources Research, 6 (1), 39-47.
- Anvaryrostmi, A.A., Heshmati, M.R., Shaverdi, M., & Bashiri, W., (2012). Performance evaluation using fuzzy network analysis and process Balanced Scorecard (Case Study: Isfahan Petrochemical Company). Journal of Industrial Management, Faculty of Humanities, Islamic Azad University, Sanandaj, 7 (21), 9-22.
- Ariyannejad M.G., & Safakish, M. S. (2008). Multi-criteria decision making. Boroujerd and Tousirkan: Islamic Azad University.
- Chou, J.S., & Pramudawardhani, D. (2015). Cross-country comparisons of key drivers, critical success factors and risk allocation for public-private partnership projects. International Journal of Project Management, 1-15.
- Chou, J. S., & Pramudawardhani, D. (2015). Cross-country comparisons of key drivers, critical success factors and risk allocation for public-private partnership projects. International Journal of Project Management, 33(5), 1136-1150.
- Chung, S.H., Lee, A.H.L., & Pearn, W.L. (2005). Analytic Network Process (ANP) Approach for Product Mix Planning in Semiconductor Fabricator. International Journal of Production Economics, 96(1), 15-36.
- Dorudian, H., Farahani, M.E., & Safahi, SH. (2007). A review of the project performance evaluation and introduction of evaluation methods in the end of project. Fourth International Conference on Project Management, 1-13.
- Ghasemi, A.R. & Ahmadi, S.H. (2013). Evaluation of higher education institutions with Balanced Scorecard and multi-criteria decision-making methods. Journal of Medical Education, 6 (10), pp. 38-49.
- Habibi A., Izyar, S., & Sarfarazi, A. (2014). Fuzzy multi-criteria decision-making. Tehran: Katibegil Publication
- Ismail, S., & Harris, F. A. (2014). Challenges in implementing public private partnership (PPP) in Malaysia. Procedia -Social and Behavioral Sciences, 164, 5 – 10.
- Malaki Vrke, Fatima. (2014). Extraction of infuntial key factors on project implementation of with public and private sectors partnership. Qazvin Islamic Azad University, A master's thesis of excutive management.
- Mirfakhrodini, H., Tahari Mehrjardi, M.H. & Mirghafoori, H. (2012). Strategic assessment models using fuzzy techniques of network analysis process and fuzzy data envelopment analysis with the balanced scorecard approach. Management studies in Iran. 16 (2). 167-188.
- Nilashi, M., Zakaria, R., Ibrahim, O., Abd. Majid, M.Z., Mohamad Zin, R., & Farahmand, M. (2015). MCPCM: A DEMATEL-ANP-Based Multi-criteria Decision-Making Approach to Evaluate the Critical Success Factors in Construction Projects. Arab J Sci Eng, vol(40), 343-361.
- Opricovic, S., & Tzeng, G.H. (2004). Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS. European Journal of Operational Research, vol (156), 445–455
- Özpeynirci, R., Yücenurşen, M., Apak, İ. & Polat, Y. (2015). A comparative analysis of accounting education’s effectiveness with the balanced scorecard method: Acase study of KMU. Procedia - Social and Behavioral Sciences 174, 1849-1858.
- Pouriya, A.R., & Alizadeh Zvarm, A. (2014). Supplier selection problem using delphi hierarchical fuzzy-VIKOR hybrid model. Enterprise Resource Management Research, 4 (4), 23-48.
- Pilevari, N. (2015). Performance Evaluation of electronic banking by combining BSC and fuzzy network analysis (case study of Tehran Pasargad Bank). financial literacy of securities analysis Journal, 8 (28), 105-117.
- Rabbani, A., Zamani, M., Yazdani-Chamzini, A., & Zavadskas, E. K. (2014). Proposing a new integrated model based on sustainability balanced scorecard (SBSC) and MCDM approaches by using linguistic variables for the performance evaluation of oil producing companies. Expert Systems with Applications, 41(16), 7316–7327.
- Razmi, J. Mina, H., & Nasrollahi, M. (2014). Product performance evaluation based on the Balanced Scorecard with a new approach. Journal of Industrial Engineering, 48 (2), 177-188.
- Saremi, M., Mousavi, S., & Sanayei, A. (2009). TQM consultant selection in SMEs with TOPSIS under fuzzy environment. Expert Systems with Applications, 36(2), 2742-2749.
- Sepehrian, A., & Parhizkar, M.M. (2010). Performance evaluation of major projects with BSC, Sixth International Conference on Project Management, 1-11.
- Tjader, Y., H. May, J., Shang, J., G. Vargas, L., & Gao, N. (2014). Firm-level outsourcing decision making: A balanced scorecard-based analytic network process model. Int. J. Production Economics, 147, 614–623.
- Wu, H.Y., Lin, Y.K., & Chang, C.H. (2011). Performance evaluation of extension education centers in universities based on the balanced scorecard. Evaluation and Program Planning, vol (34), 37-50.
- Yuan, J., Skibniewsk, M.J., Li, Q., & Zheng, L. (2010). Performance Objectives Selection Model in Public-Private Partnership Projects Based on the Perspective of Stakeholders. Journal Of Management In Engineering, 26(2), 89-104.
- Yuksel, I., & Dagdeviren, M. (2010). Using the fuzzy analytic network process (ANP) for Balanced Scorecard (BSC): A case study for a manufacturing firm. Expert Systems with Applications, (37), 1270-1278.
- Zebardast, E. (2010). Application of analytical network process in urban and regional planning. Fine Arts journal, 41, 79-90.
- Zrghambroujeni H., Abrahimi, M., & Mirfakhredini F. S. (2013). Performance evaluation hotel services with fuzzy Balanced Scorecard approach. Journal of Tourism Management Studies, 8 (22), 25-50.
|