A three-stage assembly flow shop scheduling problem with blocking and sequence-dependent set up times | ||
Journal of Industrial Engineering International | ||
دوره 8، شماره 1، فروردین 2012 اصل مقاله (399.24 K) | ||
نویسندگان | ||
Aref Maleki-Darounkolaei1؛ Mahmoud Modiri* 1؛ Reza Tavakkoli-Moghaddam2؛ Iman Seyyedi3 | ||
1Department of Management and Accounting, South Tehran Branch, Islamic Azad University, Tehran, Iran | ||
2Department of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran | ||
3Department of Industrial Engineering, Payame Noor University, Tehran, Iran | ||
چکیده | ||
This paper considers a three-stage assembly flowshop scheduling problem with sequence-dependent setup < /div> times at the first stage and blocking times between each stage in such a way that the weighted mean completion time and makespan are minimized. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time using traditional approaches or optimization tools is extremely difficult. Thus, this paper proposes a meta-heuristic method based on simulated annealing (SA) in order to solve the given problem. Finally, the computational results are shown and compared in order to show the efficiency of our proposed SA. | ||
کلیدواژهها | ||
Assembly flowshop scheduling؛ Sequence-dependent setup times؛ Blocking times؛ Weighted mean completion time؛ Makespan؛ Simulated annealing | ||