1.

An Integrated Approach of Fuzzy Quality Function Deployment and Fuzzy Multi-Objective Programming Tosustainable Supplier Selection and Order Allocation

صفحه 1-22
Amir Hossein Azadnia؛ Pezhman Ghadimi

2.

Service Performance Improvement Model: The Case of Teklehaymanot General Hospital

صفحه 23-33
Eshetie Berhan؛ Selam Yibeltal؛ Sisay Geremew

3.

Design of a Hybrid Genetic Algorithm for Parallel Machines Scheduling to Minimize Job Tardiness and Machine Deteriorating Costs with Deteriorating Jobs in a Batched Delivery System

صفحه 35-50
Mohammad Saidi-Mehrabad؛ Samira Bairamzadeh

4.

Location-Allocation and Scheduling of Inbound and Outbound Trucks in Multiple Cross-Dockings Considering Breakdown Trucks

صفحه 51-65
javad Behnamian؛ Seyed Mohammad Taghi Fatemi Ghomi؛ Fariborz Jolai؛ Pooya Heidary

5.

Effects of Probability Function on the Performance of Stochastic Programming

صفحه 67-76
Mohammad Ebrahim Karbaschi؛ Mohammad Reza Banan

6.

A Bi-Objective Airport Gate Scheduling with Controllable Processing Times Using Harmony Search and NSGA-II Algorithms

صفحه 77-90
Morteza khakzar Bafruei؛ Sananz khatibi؛ Morteza Rahmani

7.

Presentation and Solving Non-Linear Quad-Level Programming Problem Utilizing a Heuristic Approach Based on Taylor Theorem

صفحه 91-101
Eghbal Hosseini

8.

A Stochastic Optimization Approach to a Location-Allocation Problem of Organ Transplant Centers

صفحه 103-111
Mahshid Ghane؛ Reza Tavakkoli-Moghaddam

9.

Optimizing a Fuzzy Green p-hub Centre Problem Using Opposition Biogeography Based Optimization

صفحه 113-132
Marzieh Karimi؛ Seyed Hamid Reza Pasandideh

10.

Fuzzy Mathematical Model For A Lot-Sizing Problem In Closed-Loop Supply Chain

صفحه 133-141
Amir Fatehi Kivi؛ Amir aydin Atashi Abkenar؛ Hossin alipour

11.

Hub Covering Location Problem Considering Queuing and Capacity Constraints

صفحه 143-156
Mehdi Seifbarghy؛ Mojtaba Hemmati؛ Sepideh Soltan Karimi

12.

A Multi-Objective Mixed-Model Assembly Line Sequencing Problem With Stochastic Operation Time

صفحه 157-167
Parviz Fattahi؛ Arezoo Askari

13.

Modeling and Solution Procedure for a Preemptive Multi-Objective Multi-Mode Project Scheduling Model in Resource Investment Problems

صفحه 169-183
Mostafa Salimi؛ Amir Abbas Najafi

14.

Scheduling of Multiple Autonomous Guided Vehicles for an Assembly Line Using Minimum Cost Network Flow

صفحه 185-193
Hamed Fazlollahtabar

15.

A Ratio-Based Efficiency Measurement for Ranking Multi-Stage Production Systems in DEA

صفحه 195-202
Roza Azizi؛ Reza Kazemi Matin


سامانه مدیریت نشریات علمی. قدرت گرفته از سیناوب