تعداد نشریات | 418 |
تعداد شمارهها | 9,987 |
تعداد مقالات | 83,495 |
تعداد مشاهده مقاله | 76,810,092 |
تعداد دریافت فایل اصل مقاله | 53,906,683 |
Solving a bi-objective project capital budgeting problem using a fuzzy multi-dimensional knapsack | ||
Journal of Industrial Engineering International | ||
مقاله 7، دوره 7، شماره 13، خرداد 2011، صفحه 67-73 اصل مقاله (99.79 K) | ||
نویسندگان | ||
A Khalili-Damghani1؛ M Taghavifard2 | ||
1Assistant Prof., Dep. of Industrial Engineering, Science and Research Branch, Islamic Azad University, Tehran, Iran | ||
2Assistant Prof. Dep. of Industrial Engineering, Tehran-South Branch, Islamic Azad University, Tehran, Iran | ||
چکیده | ||
In this paper, the researchers have proposed a multi-dimensional knapsack model for project capital budgeting problem in uncertain situation which has been modeled through fuzzy sets. The optimistic and pessimistic situations were considered and associated deterministic models were yielded. Numerical example has been supplied toillustrate the performance of proposed model. The results were promising in the sense of helping the decision makers. | ||
کلیدواژهها | ||
Capital budgeting؛ Fuzzy multi-dimesional knapsack؛ Project selection؛ Portfolio Selection | ||
آمار تعداد مشاهده مقاله: 941 تعداد دریافت فایل اصل مقاله: 657 |