- Pakmaram, A., Mohammadi, B., & Beikzad, J. (2010) . Factors affecting the application of cost management systems in the petrochemical industry in Iran. Journal of Productivity Management (beyond management).4(14), 131-155.
- Chaharsooghi, S.K., & Hasani, M. (2013). Identify, classify and prioritize the sharing of knowledge in the field of project management tools. Journal of Information Technology Management. 5(3),43-62
- Haghighi, M., Pahlavani, M., & Saadi, M.R. (2011). Factors Influencing the creation of knowledge in research centers and the development of the petrochemical industry. Journal of Information Technology Management. 3(8), 63-80.
- DanaeeFard, H ., & Emami, s.m.(2011). Strategies of Qualitative Research: A Reflection on Grounded Theory. Strategic Management Thought, 1(2).69-97.
- Derakhshan, M., & Taklif, A.(2015). The Transfer and Development of Technology in Iranian Upstream Oil Sector: Considerations on the Concepts, Requirements, Challenges and Remedies. Iran’s energy Economic Research, 4(14), 33-88.
- Zarei, B ., & Oskuee, V .(2007). Representing Knowledge acquisition and delays in projects Iranian Petrochemical . International Conference on Project Management.
- Sobhiyah , M.H ., Jafarinasr, M.R., & Azizi, M .(2010). Examine the technological challenges of international cooperation in the petrochemical industry in Iran (Case study: technological collaboration in the project MTP). Journal - Management and human resources in the petroleum industry. 4(13),131-151.
- Aliahmadi, A., & Akhavan, P. (2006). Investigate the causes of the success of science and technology programs and policies in developed countries. International Journal of Engineering. 17(2), 19-28.
- Gholipour Soleimani, A., Shahroodi, K., & Salimi, A. (2011). Petrochemical supply chain performance (effect of the location of production, supply chain uncertainty and manufacturing practices and production). Journal of Industrial Management, 5 (14).1-10.
- FatemiAmin, S.R., & et al. (2013). The strategic plan of Industry, Mine and Trade (macro level). The martyr Beheshti University Jihad, 1(93).
- Ghaffarian, W., & Dehghani, H. (2007). Scientific theories and provide hands-on experience in Management Studies. Management research in Iran, 10(4).151-167.
- Abdul-Rahman, H., Takim, R., & Min, W. S. (2009). Financial-related causes contributing to project delays. Journal of Retail & Leisure Property, 8(3), 225-238.
- Al-Momani, A. H. (2000). Construction delay: a quantitative analysis. International journal of project management, 18(1), 51-59.
- Amer, W. H. (1994). Analysis and evaluation of delays in construction projects in Egypt (Doctoral dissertation, MSc. thesis, Zagazig University, Egypt).
- Assaf, S. A., Al-Khalil, M., & Al-Hazmi, M. (1995). Causes of delay in large building construction projects. Journal of management in engineering, 11(2), 45-50.
- Blomquist, T., & Wilson, T. L. (2009). On productivity in project organizations. International journal of managing projects in business, 2(4), 591-598.
- Bordoli, D. W., & Baldwin, A. N. (1998). A methodology for assessing construction project delays. Construction Management & Economics, 16(3), 327-337.
- Bramble, B.B.,& Callahan, M. T. (2010). Construction delay claims. Aspen Publishers.
- Bubshait, A. A. (2003). Incentive/disincentive contracts and its effects on industrial projects. International Journal of Project Management, 21(1), 63-70.
- Chan, D. W., & Kumaraswamy, M. M. (1997). A comparative study of causes of time overruns in Hong Kong construction projects. International Journal of project management, 15(1), 55-63.
- Corbin, J. M., & Strauss, A. (1990). Grounded theory research: Procedures, canons, and evaluative criteria. Qualitative sociology, 13(1), 3-21.
- Dlakwa, M. M., & Culpin, M. F. (1990). Reasons for overrun in public sector construction projects in Nigeria. International Journal of Project Management, 8(4), 237-241.
- Fallahnejad, M. H. (2013). Delay causes in Iran gas pipeline projects. International Journal of Project Management, 31(1), 136-146.
- Gidado, K., & Niazai, G. (2012). Causes of project delay in the construction industry in Afghanistan, 63-74.
- Glaser, B. G., & Strauss, A. L. (2008). The discovery of grounded theory: Strategies for qualitative research (3rd ed.). New Brunswick, NJ: Aldine Transaction.
- Hong Pham, L., & Hadikusumo, H. (2014). Schedule delays in engineering, procurement, and construction petrochemical projects in Vietnam: A qualitative research study. International Journal of Energy Sector Management, 8(1), 3-26.
- Hughes, R., & Thorpe, D. (2014). A review of enabling factors in construction industry productivity in an Australian environment. Construction Innovation, 14(2), 210-228.
- Jones, B., Jenkinson, I., & Wang, J. (2009). Methodology of using delay-time analysis for a manufacturing industry. Reliability Engineering & System Safety, 94(1), 111-124.
- Kaming, P. F., Olomolaiye, P. O., Holt, G. D., & Harris, F. C. (1997). Factors influencing construction time and cost overruns on high-rise projects in Indonesia. Construction Management & Economics, 15(1), 83-94.
- Mahamid, I. (2013). Contractor’s perspective toward factors affecting labor productivity in building construction. Engineering, Construction and Architectural Management, 20(5), 446-460.
- Mansfield, N. R., Ugwu, O. O., & Doran, T. (1994). Causes of delay and cost overruns in Nigerian construction projects. International Journal of Project Management, 12(4), 254-260.
- Marzouk, M. M., & El-Rasas, T. I. (2014). Analyzing delay causes in Egyptian construction projects. Journal of advanced research, 5(1), 49-55.
- McTague, B., & Jergeas, G. (2002). Productivity Improvements on Alberta Major Construction Projects: Phase I-Back to Basics. Alberta economic development, 1–130.
- O'Brien, J. J. (1976). Construction Delay: Responsibilities, Risks, and Litigation. Cahners Books International.
- Pahlavani, A., Zarei, B., (2005). Identifying delay causes of equipment suppliers.Project Management Conference.
- Patton, M. Q. (1990). Qualitative evaluation and research methods. SAGE Publications, inc.
- Pickavance, K. (2000). Delay and disruption in construction contracts. LLP.
- Strauss, A. L., & Corbin, J. M. (1990). Basics of qualitative research (15). Newbury Park, CA: Sage.
- Venkatasubramanian, V. (2005). Prognostic and diagnostic monitoring of complex systems for product lifecycle management: Challenges and opportunities. Computers & Chemical Engineering, 29(6), 1253-1263.
- Zack, J. G. (2003). Schedule delay analysis; is there agreement. In Proc. PMI-CPM college of performance spring conf.
- The country's oil and energy industry publication( http://www.daneshenaft.ir).
- Wikipedia: The Free Encyclopedia ( https://www.wikipedia.org ).
- Site isna: Iranian Students News Agency ( http://www.isna.ir).
|