- Aouni, B., Colapinto, C., & La Torre, D. (2014). Financial portfolio management through the goal programming model: Current state-of-the-art. European Journal of Operational Research, 234, 536–545. Retrieved from http://doi.org/10.1016/j.ejor.2013.09.040.
- Asgharpoor, M. (2013). Multi Criteria decision making (11rd ed.). Tehran:Tehran university publication.
- Azar, A. (2007). Operation research. Tehran: SAMT publication.
- Babaei, H., Tootooni, M., Shahanaghi, K., & Bakhsha, A. (2009). Lexicographic Goal Programming Approach for Portfolio Optimization, 5(9), 63–75.
- Choudhary, D., & Shankar, R. (2014). A goal programming model for joint decision making of inventory lot-size, supplier selection and carrier selection. Computers and Industrial Engineering, 71, 1–9. Retrieved from http://doi.org/10.1016/j.cie.2014.02.003
- Gharegozlo, A., Barzegar, M. 2008. Goal programming using AHP approach to optimize the production combination. Journal of Business Studies. 29. 59-72.
- Heidari Gharebalagh, H., Moheb Rabani, S. 2010. Goal programming model of production with fuzzy approach in the oil refining industry. Journal of management. 18. 48-60.
- Jadidi, O., Zolfaghari, S., & Cavalieri, S. (2013). A new normalized goal programming model for multi-objective problems: A case of supplier selection and order allocation. International Journal of Production Economics, 148, 158–165. Retrieved from http://doi.org/10.1016/j.ijpe.2013.10.005.
- Jones, D., & Tamiz, M. (2010). Practical Goal Programming (Vol.157). Springer.
- Leung, S. C. H., & Chan, S. S. W. (2008). A goal programming model for aggregate production planning with resource utilization constraint. Computers & Industrial Engineering, 56(3), 1053–1064. Retrieved from http://doi.org/10.1016/j.cie.2008.09.017.
- Leung, S. C. H., & Ng, W. (2007). A goal programming model for production planning of perishable products with postponement. Computers & Industrial Engineering, 53, 531–541. Retrieved from http://doi.org/10.1016/j.cie.2007.05.010.
- Makouie, A. (2004). Introduction to production planning, Tehran: Danesh Parvar Publication (In Persian)
- Mehregan,M.,Kazemi,A. & Kamyabmoghadas,A. (2005). Goal production planning for telecommunication cables in Yazd suger company. 74. 133-147.
- Mohanty, R. P., & Koay, J. C. C. (1988). A Goal Programming Application for Waste Treatment Quality Control. International Journal of Quality & Reliability Management, 5, 65–77. Retrieved from http://doi.org/10.1108/eb002914.
- Momeni, M. (2013). New topics in operation research. Tehran: moalef.
- Nixon, J. D., Dey, P. K., Davies, P. a., Sagi, S., & Berry, R. F., (2014), Supply chain optimisation of pyrolysis plant deployment using goal programming. Energy,No.68, pp. 262–271. Retrieved from http://doi.org/10.1016/j.energy.2014.02.058
- Safaie Ghadikaliee, A., Mahdavi, G. (2001). Application of goal programming model to optimize production planning in meat products companies. Journal of Humanities and Social Sciences. 4. 93-112.
- Safari,S., Sabziyan papi,H. (2013). University performance evaluation by using Lexicograph goal programming approach(A case study SHAHED university).Journal of Industrial Management-Islamic Azad University of Sannandaj.25(8).129-143.
|