- Ahmed, S. M., Ahmad, R., Saram, D. E., & Darshi, D. (1999). Risk Management Trends in the Hong Kong Construction Industry: A Comparison of Contractors and Owners Perceptions. Engineering Construction and Architectural Management, 6(3), 225-234.
- Alexander, C. (2005). The Present and Future of Financial Risk Management. Journal of Financial Econometrics, 3(1), 3-25.
- Asgharizadeh, A., & Saeidi, A. (2012). Cost Risk Assessment of Power Plant Projects Based on Three-Dimensional Model. Industrial Management, 4(8), 1-14.
- Baker, W., & Reid, H. (2004). Identifying and Managing Risk. Pearson Education. Frenchs Forest. Australia.
- Danıelsson, J., Jorgensen, B. N., & de Vries, C. G. (2002). Incentives for Effective Risk Management. Journal of Banking & Finance, 26(7), 1407-1425.
- Dey, P. K. (2010). Managing Project Risk Using Combined Analytic Hierarchy Process and Risk Map. Applied Soft Computing, 10(4), 990-1000.
- El-Sayegh, S. M., & Mansour, M. H. (2015). Risk Assessment and Allocation in Highway Construction Projects in the UAE. Journal of Management in Engineering, 04015004.
- Esmaeilzadeh, A. (2011). Risk Classification of Construction Projects and Analysis them using Structural Equation Modeling and Grey Approach. M.Sc Thesis. Allameh Tabataba'i University, Tehran.
- Fang, D., Li, M., Fong, P. S. W., & Shen, L. (2004). Risks in Chinese Construction Market-Contractors' Perspective. Journal of Construction Engineering and Management, 130(6), 853-861.
- Fatholahzadeh, S., & Mehdizadeh, R. (2013). Investigating the Risks of Road Construction Projects in Iran as A developing Country, International Conference on Civil Engineering Architecture & Urban Sustainable Development, 18 &19 December 2013, Tabriz, Iran.
- Habibi, A. (2013). Practical Teaching of SPSS (3th ed.). Pars Modir. Tehran. Iran.
- Khoshghalb, A. (2011). Identification and Ranking of Construction projects Risk Based on PMBOK Standard by Grey Topsis Method. M.Sc Thesis. University of Tehran, Tehran.
- Mehregan, M. R., Asgharizadeh, E. A., & Safari, H. (2008). The Design a Model to Assess Competitiveness at the Firm Level by Using Structural Equation Modeling. Iranian Journal of Trade Studies, 12(46), 1-36.
- Memar, A., & Reshadatjoo, H. (2014). Identifying Risk Management Determinants and Assessing its Effects on Strategic Management in Tondgooyan Petrochemical Company. Journal of Industrial Strategic Management, 11(34), 73-82.
- Momeni, M., & Ghayoumi, A. F. (2012). Statistical Data Analysis Using SPSS (7th ed.). Tehran: Simaye Danesh.
- Mousavi, S. M., Tavakkoli-Moghaddam, R., Azaron, A., Mojtahedi, S. M. H., & Hashemi, H. (2011). Risk Assessment for Highway Projects Using Jackknife Technique. Expert Systems with Applications, 38(5), 5514-5524.
- Ojra, J. (2014). Strategic management accounting practices in Palestinian companies: application of contingency theory perspective (Doctoral dissertation, University of East Anglia).
- Raftery, J. (2003). Risk Analysis in Project Management. Routledge. NY. USA.
- Sarmad, Z., Bazargan, A., & Hejazi, E. (2014). Research Methods in the Behavioral Sciences (26th ed.). Agah. Tehran.
- Shaban, S. S. A. (2008). Factors Affecting the Performance of Construction Projects in the Gaza Strip (Doctoral dissertation, The Islamic University of Gaza–Palestine).
- Shen, L. Y., Wu, G. W., & Ng, C. S. (2001). Risk assessment for construction joint Ventures in China. Journal of Construction Engineering and Management, 127(1), 76-81.
- Smith, N. J., Merna, T., & Jobling, P. (2009). Managing Risk: in Construction Projects. John Wiley & Sons. USA.
- Tam, C. M., Zeng, S. X., & Deng, Z. M. (2004). Identifying Elements of Poor Construction Safety Management in China. Safety Science, 42(7), 569-586.
- Wang, S. Q., Dulaimi, M. F., & Aguria, M. Y. (2004). Risk Management Framework for Construction Projects in Developing Countries. Construction Management and Economics, 22(3), 237-252.
- Ward, S., & Chapman, C. (2003). Transforming Project Risk Management into Project Uncertainty Management. International Journal of Project Management, 21(2), 97-105.
- Xie, G., Yue, W., Wang, S., & Lai, K. K. (2010). Dynamic Risk Management in Petroleum Project Investment Based on A Variable Precision Rough Set Model.Technological Forecasting and Social Change, 77(6), 891-901.
- Xu, Y., Yeung, J. F., Chan, A. P., Chan, D. W., Wang, S. Q., & Ke, Y. (2010). Developing A Risk Assessment Model for PPP Projects in China—A Fuzzy Synthetic Evaluation Approach. Automation in Construction, 19(7), 929-943.
- Zeng, S. X., Tam, C. M., & Tam, V. W. (2015). Integrating Safety, Environmental and Quality Risks for Project Management Using A fmea Method. Engineering Economics, 66(1).
- Zhao, X., Hwang, B. G., & Phng, W. (2014). Construction Project Risk Management in Singapore: Resources, Effectiveness, Impact, and Understanding. KSCE Journal of Civil Engineering, 18(1), 27-36.
- Zou, P. X., Zhang, G., & Wang, J. (2007). Understanding the Key Risks in Construction Projects in China. International Journal of Project Management, 25(6), 601-614.
|