- Asfidani, Mohammad. &Kimasi, Masood. &Roustie, Ahmad. (2018). Identifying Corporate Customer Behavior Pattern and Its Relationship with Corporate Banking Strategies in Iranian Banking Industry. Shahed University Business Strategies Journal, 2(1) 1-4. (in persian).
- Baudin, M. (2002). Lean assembly: the nuts and bolts of making assembly operations flow. New York, USA: Productivity Press.
- Bouranta, Nancy, and Evangelos, Psomas. (2017). A comparative analysis of competitive priorities and business performance between manufacturing and service firms. International Journal of Productivity and Performance Management, 66(7): 914-931.
- Boysen, N. &Fliedner, M. &Scholl A.A. (2007). Classification of assembly line balancing problems. European Journal of Operational Research, 183: 674– 693.
- Bukchin, Yossi. &Raviv, Tal. (2018). Constraint programming for solving various assembly line balancing problems. Omega, 78: 57-68.
- Byrne, M. (2001). Sampling for qualitative research. AORN J. 73(2): 494- 498.
- Caramia, M. &Dell’Olmo, P. (2006). Effective Resource Management in Manufacturing Systems Optimization Algorithms for Production Planning. Springer series in advanced manufacturing.
- Chryssolouris, G. (1991). An Approach for Allocating Manufacturing Resources to Production Tasks. Journal of Manufacturing Systems, 10 (5):368-374.
- Dangayach, G.S., & Deshmukh, S.G. (2001). Manufacturing strategy: literature review and some issue. Int. J. of Operations & Production Management, 21(7): 884-932.
- Dehnavi, Alireza. &Nasiri Aghdam, Iman. &Pradhan, Biswajeet. &Morshed Varzandeh, Mohammad Hossein. (2015). A new hybrid model using step-wise weight assessment ratio analysis (SWARA) technique and adaptive neuro-fuzzy inference system (ANFIS) for regional landslide hazard assessment in Iran. CATENA, 135: 122-148.
- Eisenhardt, Kathleen M. &Melissa, E. (2007). Theory building from cases: Opportunities and challenges. Academy of management journal, 50(1): 25-32.
- Fisel, Johannes. &Exner, Yannick. &Stricker, Nicole. &Lanza, Gisela. (2019). Changeability and flexibility of assembly line balancing as a multi-objective optimization problem. Journal of Manufacturing Systems, 53: 150-158.
- Graham, R. L. (1996). Bounds for certain multiprocessing anomalies. Bell Syst. Tech. J, 45:1563–1581.
- Jordi, Pereira. &Álvarez-Miranda, Eduardo. (2017). An exact approach for the robust assembly line balancing problem. Omega, 78: 85-98.
- Kersuliene, V. &Zavadskas, E. Turskis, Z. (2010). Selection of rational dispute resolution method by applying new step-wise weight assessment ratio analysis (SWARA). Journal of Business Economics and Management, 11 (2): 243-258.
- Kim, Thai. &Young. (2018). Improving warehouse responsiveness by job priority management. A European distribution centre field study, Computers & Industrial Engineering. https://doi/org/10/1016/j/cie/2018/12/011
- Kroes, J.R. &Ghosh, S. (2010). Outsourcing congruence with competitive priorities: impact on supply chain and firm performance. Journal of Operations Management, 28 (2): 124-143.
- Levi, D. S. &Kaminsky, P. &Levi, E. S. (2003). Designing and managing the supply chain: Concepts, strategies, and case studies, McGraw-Hill.
- Miltenburg, J. (2008). Setting manufacturing strategy for a factory-within-a- factory, International Journal of Production Economics, 113: 307-323.
- Motaghi, Hayedeh. (2015). Production and Operations Management. Avaya Shervin Publishing. (in persian).
- Muchiri, P. (2011). Development of maintenance function performance measurement framework and indicators. International Journal of Production Economics, 131:295-302.
- Paksoy, T. &Özceylan, E. &Gökçen, H. (2012). Supply chain optimization with assembly line balancing. International Journal of Production Research, 50:3115-3136.
- Peng, Kunkun. &Wen, Long. & Li Ran. & Gao, Liang. &Li, Xinyu. (2018). An Effective Hybrid Algorithm for Permutation Flow Shop Scheduling Problem with Setup Time.Procedia CIRP, 72: 1288-1292.
- Rafie, Majid. &Mohammadi Talab, Attieh. (2016). Presenting a Mathematical Model with a Stable Optimization Approach for Designing a Dynamic Cellular Production System Considering Multifunction Machines. A Journal of Industrial Engineering Research in Production Systems, 7(9): 281-295. (in persian).
- Ramezanian, Reza. &Ezzatpanah, Abdullah. (2015). Modeling and solving multi-objective mixed-model assembly line balancing and worker assignment problem. Computers & Industrial Engineering, 87: 74–80.
- Scholl, A. &Klein, R. &Domschke, W. (1998). Pattern based vocabulary building for effectively sequencing mixed model assembly lines. Journal of Heuristics, 4: 359–381.
- Shirazi, Hassan. &Hassanavi, Reza. &Kavian, Mohammad Hossein. (2018). Presenting a Model of Industrial Production Control System. Journal of Control Command, 2(3) : 79-91. (in Persian).
- Sikora, Celso. &Gustavo, Stall. &Lopes Thiago, Cantos. &Schibelbain Magatã, Daniel Leandro. (2017). Integer based formulation for the simple assembly line balancing problem with multiple identical tasks. Computers & Industrial Engineering, 104: 134-144.
- Valipour, A. N. &Yahaya, N. (2017). Hybrid SWARA-COPRAS method for risk assessment in deep foundation excavation project: An Iranian case study. Journal of Civil Engineering and Management, 23 (4): 524-532.
- Wei, Jiayin. &Xu, Daoyun. &Qin, Yongbin. (2017). On-Line Load Balancing With Task Buffer. Computing and Informatics, 36: 1207-1234.
- Yücenur, G. &Nilay, Şeyma Çaylak. (2020). An integrated solution with SWARA&COPRAS methods in renewable energy production: City selection for biogas facility. Renewable Energy, 145: 2587-2597.
- Zavadskas, E.K. &Kaklauskas, Vilutiene. T. (2009). Multi criteria evaluation of apartment blocks maintenance contractors: Lithuanian case study. International Journal of Strategic Property Management, 13 (4): 319-338.
|