Hassani, Ali, Hosseini, Seyed Mohamad Hasan, Behroozi, Foroogh. (1400). Minimizing the operational costs in a flexible flow shop scheduling problem with unrelated parallel machines. نشریه علمی پژوهشی دانشگاه آزاد اسلامی, 14(1), 169-184. doi: 10.22094/joie.2021.1890852.1718
Ali Hassani; Seyed Mohamad Hasan Hosseini; Foroogh Behroozi. "Minimizing the operational costs in a flexible flow shop scheduling problem with unrelated parallel machines". نشریه علمی پژوهشی دانشگاه آزاد اسلامی, 14, 1, 1400, 169-184. doi: 10.22094/joie.2021.1890852.1718
Hassani, Ali, Hosseini, Seyed Mohamad Hasan, Behroozi, Foroogh. (1400). 'Minimizing the operational costs in a flexible flow shop scheduling problem with unrelated parallel machines', نشریه علمی پژوهشی دانشگاه آزاد اسلامی, 14(1), pp. 169-184. doi: 10.22094/joie.2021.1890852.1718
Hassani, Ali, Hosseini, Seyed Mohamad Hasan, Behroozi, Foroogh. Minimizing the operational costs in a flexible flow shop scheduling problem with unrelated parallel machines. نشریه علمی پژوهشی دانشگاه آزاد اسلامی, 1400; 14(1): 169-184. doi: 10.22094/joie.2021.1890852.1718


سامانه مدیریت نشریات علمی. قدرت گرفته از سیناوب