تعداد نشریات | 418 |
تعداد شمارهها | 9,997 |
تعداد مقالات | 83,560 |
تعداد مشاهده مقاله | 77,801,148 |
تعداد دریافت فایل اصل مقاله | 54,843,811 |
Building a Multi-Objective Model for Multi-Product Multi-Period Production Planning with Controllable Processing Times: A Real Case Problem | ||
Journal of Optimization in Industrial Engineering | ||
مقاله 1، Volume 2، Issue 4، آذر 2009، صفحه 1-11 اصل مقاله (246.68 K) | ||
نویسندگان | ||
Mir Bahadorgholi Aryanezhad1؛ Mehdi Karimi-Nasab* 1؛ Seyed Mohammad Taghi Fatemi Ghomi2 | ||
1Department of Industrial Engineering, Iran University of Science and Technology, Tehran, Iran | ||
2Department of Industrial Engineering, Amirkabir University of Technology, Tehran, Iran | ||
چکیده | ||
Model building is a fragile and complex process especially in the context of real cases. Each real case problem has its own characteristics with new concepts and conditions. A correct model should have some essential characteristics such as: being compatible with real conditions, being of sufficient accuracy, being logically traceable and etc. This paper discusses how to build an efficient model for a real case production planning problem. This process is reinforced by providing the proofs confirming the special characteristics of the final model such as proving its NP-Completeness. Also, the extremes of both objective functions – production smoothing versus cost minimizing – are calculated analytically. Finally, the case study and its solution methods are discussed briefly. | ||
کلیدواژهها | ||
Multi-objective؛ Single machine؛ production planning؛ Multi-product؛ Multi-period؛ Controllable processing time؛ Pareto-optimal solutions | ||
آمار تعداد مشاهده مقاله: 4,454 تعداد دریافت فایل اصل مقاله: 2,851 |