| تعداد نشریات | 418 |
| تعداد شمارهها | 10,013 |
| تعداد مقالات | 83,708 |
| تعداد مشاهده مقاله | 79,562,610 |
| تعداد دریافت فایل اصل مقاله | 56,269,330 |
Building a Multi-Objective Model for Multi-Product Multi-Period Production Planning with Controllable Processing Times: A Real Case Problem | ||
| Journal of Optimization in Industrial Engineering | ||
| مقاله 1، Volume 2، Issue 4، آذر 2009، صفحه 1-11 اصل مقاله (246.68 K) | ||
| نویسندگان | ||
| Mir Bahadorgholi Aryanezhad1؛ Mehdi Karimi-Nasab* 1؛ Seyed Mohammad Taghi Fatemi Ghomi2 | ||
| 1Department of Industrial Engineering, Iran University of Science and Technology, Tehran, Iran | ||
| 2Department of Industrial Engineering, Amirkabir University of Technology, Tehran, Iran | ||
| چکیده | ||
| Model building is a fragile and complex process especially in the context of real cases. Each real case problem has its own characteristics with new concepts and conditions. A correct model should have some essential characteristics such as: being compatible with real conditions, being of sufficient accuracy, being logically traceable and etc. This paper discusses how to build an efficient model for a real case production planning problem. This process is reinforced by providing the proofs confirming the special characteristics of the final model such as proving its NP-Completeness. Also, the extremes of both objective functions – production smoothing versus cost minimizing – are calculated analytically. Finally, the case study and its solution methods are discussed briefly. | ||
| کلیدواژهها | ||
| Multi-objective؛ Single machine؛ production planning؛ Multi-product؛ Multi-period؛ Controllable processing time؛ Pareto-optimal solutions | ||
|
آمار تعداد مشاهده مقاله: 4,463 تعداد دریافت فایل اصل مقاله: 2,856 |
||